About the procedure
Grant for electricity storage facilities under procedure BG-RRP-4.0034 "National Infrastructure for Storage of Electricity from Renewable Sources" (RESTORE)
Open for applications until November 21, 2024.
Total budget: 1,179,365,490 BGN
Maximum project implementation deadline: until March 31, 2026.

Eligible candidates
1. Be traders within the meaning of the Commercial Act or be non-profit legal entities or be an equivalent person registered in a member state of the European Economic Area.
2. Have duly registered the information about their beneficial owners.
3. To provide, at the application stage , a bank guarantee for participation in the amount of 3% of the grant for which they are applying.
4. To have , independently or through their shareholders, equity capital of:
BGN 6 million for project proposals for batteries with planned capacity >= 20 MWh and <= 50 MWh;
BGN 10 million for project proposals for batteries with planned capacity > 50 MWh.
5. Have engaged a technical manager (individual or legal entity) who has worked on a similar project, as follows:
A project with at least 10 MW of installed capacity of an electricity generation site or storage facility connected to medium or high voltage networks, for project proposals with an installed capacity of the electricity storage facility from 10 MW to 20 MW.
A project with at least 20 MW of installed capacity of an electricity generation site or storage facility connected to high voltage networks, for project proposals with an installed capacity of the electricity storage facility above 20 MW.
6. To build and commission "new usable energy storage capacity" as follows:
the works in relation to the electricity storage facility must not have commenced on the date of submission of the investment proposal
or
may have commenced on or after June 25, 2024, but the electricity storage facility must not have been put into operation by the date of submission of the investment proposal.
7. Have achieved the following stage of readiness at the time of submitting the project proposal:
a valid statement of accession or a valid preliminary accession agreement or a valid accession agreement with ESO EAD.
8. To envisage the construction of an electrical energy storage facility with the following technical characteristics:
• guaranteed (useful) capacity for a storage duration of at least 2 hours (C-Rate to be maximum C/2);
• nominal alternating current power (AC power) of at least 10 MW;
• meet the parameters for ensuring reserves for primary frequency control and/or automatic secondary frequency control and exchange capacities specified in Appendix 8
*When concluding a financing contract, applicants will be required to submit a bank guarantee for good performance in the amount of 10% of the approved grant.

Amount of funding
Maximum amount of funding for one proposal for one enterprise – 148,643,080 leva.
Maximum funding intensity up to 50% of eligible costs, but not more than BGN 371,607.70 (excluding VAT) per 1 MWh of usable energy capacity of electrical energy storage facilities.
(Example: At a value of 743,215.40 leva excluding VAT for 1 mWh batteries, 371,607.70 leva are financed)

Eligible costs
1. Expenses for the acquisition of fixed assets (FIXED).
2. Expenses for acquisition of long-term intangible assets (LTAs).
3. Costs for construction and installation works (C&I).
4. Costs for engineering and technical services in connection with the design.
5. Costs for construction of connection facilities and connection to the electricity transmission/distribution network (provided that they have a direct optical connection to the telecommunications network of ESO EAD, respectively - SCADA/EMS of ESO EAD) network.
6. Administrative costs for state and municipal fees in connection with registration, licensing and permit regimes.
*The total cost of expenses under items 4 and 6 cannot exceed 10% of the project value.